Our realizations

Lusail Sports Arena - Qatar

Lusail Sports Arena
Location: Qatar

Was a big project for us with a concentration of more than 150 people where were involved 70 people that represented the rope access staff and 80 people that represented the general workers. During the entire period of six months, our team passed through all roof construction steps: beams installing, glazing installing, aluminium panels installing, installing gutter & mineral wool, mastic sealant & EPDM insulation, panel frame gutters, brackets & leds.

View more
  • Over 40.000 pcs aluminium triangles panel installed
  • Glazing works over 2000 pcs
  • Frame panel gutters over 5000 pcs
  • Over 200.000 meters mastic sealant
  • Mineral wool insulation
  • EPDM & Sealant sillicone insulation
  • Safety railing, brackets with LED & anchor, other miscellaneous works

Canary Wharf Rail Station

Canary Wharf Rail Station
Location: London

On Canary Wharf Rail Station project our team executed miscellaneous works at height , we mention the most important processes covered: Installing the Safety nets & Nets platform for facilities and increase the work at height, installing the aluminium membrane frames on timber structure, installing the air pillow of ETFE membrane

View more
  • Safety Nets & Nets platforms installation
  • Aluminium frame installation on timber structure
  • Installing ETFE air pillow membrane
  • Rigging and Lifting heavy parts
  • Other related works at height: drilling, bolts tighten, sealant etc

Les Halles Forum

Les Halles Forum
Location: Paris

Our team service on the project Les Halles - La Canopée lasted approximately 4 months. During this time, we provided various works for the roof & facade such as: steel beam installing, aluminium panel installing, aligned (the support of the glass), Glazing work - installing over 1000 pcs multilayer glass with weight between 60 - 130 Kg.

View more
  • Heavy steel beam installation & alignment
  • Aluminium frame panel instalation & alignment
  • Glazing installation
  • Anchoring & Rain stoppers installation
  • Gangway & Railing aluminium installation
  • Safety fences installation at height

Oil Derrick Upgrade

Oil Derrick Odfjell Upgrade / Extension
Location: KOREA – Geoje

The Oil Derrick Odfjell was the second project in South Korea for our team and the work consisted in upgrading the structure with an iron extension. The job was complex because we had to use more rope access rigging techniques, the crane didn't help us too much in the upgrading process because the space didn't allow it . Finally the job was done with success in the estimated time.

View more
  • Rigging and Liffting works
  • Complex rope access maneuvers
  • Used a large types of hand tools
  • Supervision & coordination works.

Oil Derrick Construction

Building Oil Derrick West Hercules
Location: KOREA – Geoje

This was the first Derrick oil rig structure raised from 0 by our team in collaboration with a Korean team. We encountered dificulties at the beginning because the majority of Korean people knew only their language and was very difficulty to speak/understand with eachother, but, in the end, we can say that even if we had this linguistic barrier, we did a great work togheter and complete the project in time. The customer was satisfied and he asked us to return and start the second job for another Derrick.

View more
  • Rigging and Lifting works
  • Complex rope access maneuvers
  • Used a large types of hand tools
  • Supervision & coordination works.

Oil Rig Maintenance Brazil

Semi Submersible Oil Rig
Location: Brazil - Niteroi Shipyard

In this project our duty team consisted in differents maintenance work, we replaced some pipes and fitting and upgrading the engines of the Oil Rig with others new, bigger and heavier. Our climbers used differents rigging and lifting maneuvers so they finished the job on time and all work was supervised by our technician IRATA L3.

View more
  • Supervision & coordination works.
  • Rigging and Liffting
  • Upgrading old engines with other bigger and new.
  • Visual inspection according to the plan.

Oil Rig Maintenance China

Semi Submersible Oil Rig
Location: China - Dalian Shipyard

The our team work, in this project, consisted in various maintenance work on a Semi-Submersible Oil Rig. The most notable step performed: Inspected the required areas, replaced old hydraulic pieces with other new, replaced some pipes and fittings and supervising and coordination all maintenance works.

View more
  • Supervision & coordination works.
  • Rigging and Liffting heavy parts.
  • Replaced old pipes and fittings.
  • Visual inspection according to the plan.