Oil Rig Maintenance
Semi Submersible Oil Rig
Location: China - Dalian Shipyard
The our team work, in this project, consisted in various maintenance work on a Semi-Submersible Oil Rig. The most notable step performed: Inspected the required areas, replaced old hydraulic pieces with other new, replaced some pipes and fittings and supervising and coordination all maintenance works.
- Supervision & coordination works.
- Rigging and Liffting heavy parts.
- Replaced old pipes and fittings.
- Visual inspection according to the plan.